Thursday, 1 March 2012

Rope Access Drainage Clearance for BT

We have completed high level drainage clearance for BT today.......the 4th floor was suffering water ingress due to a flooded balcony which contained a number of drains.
We deployed 2 Rope Access Techs to carry out the works..... which consisted of descending down 2 floors, de-rigging pigeon netting that enclosed the drainage balcony, entering the balcony and removing silt and debris from the blocked drainage system.......on completion of this our technicians
re-applied hogg rings back on to the netting system.







We are the preferred contractor to carry out works @ height for Monteray on behalf of BT....our working relationship has been ongoing since 2002 
If your Organisation requires any of our services, please dont hesitate to contact us through our website      www.complete-access.co.uk


No comments:

Post a Comment