Confined Space Silo Cleaning & Inspection
We have completed today the annual clean and inspection to a number of silo's for a National Bakeries Company.
We deployed 3 of our specialist Confined Space / Rope Access team to carry out the works ... all works were overseen by our Confined Space Supervisor who is trained & certificated to City & Guilds Level 4.
Prior to works commencing a number of statutory obligations had to be fulfilled.
A SSOW Safe System of Work was put in place .... this included supplying the Client with site specific Risk & Method Statements.
A PTW Permit to Work was completed by our Supervisor and the Client.
A LOTO Lock Out Tag Out system was put in place on all associated electrical / mechanical plant.
An initial atmospheric reading was taken using a 4 gas air monitor, this PEAK reading was logged on the PTW and the Gas Reading Log.
Once the above obligations were satisfied, our technicians proceeded to carry out the cleaning & inspections.
Cleaning consisted of removal of build up of flour to walls and roof of silos..... the Inspections consisted of providing a written & photographic report on any signs of infestation, condition of explosion blast covers and filtration system.
Cleaning & Inspections to food storage silos must be carried out on an annual basis.
On completion of the works.... the PTW was signed off and the LOTO was restored.
If your Organisation requires any of our Confined Space Services .... please dont hesitate to contact us via our New website
www.completeaccess-industrialservices.co.uk
We have completed today the annual clean and inspection to a number of silo's for a National Bakeries Company.
We deployed 3 of our specialist Confined Space / Rope Access team to carry out the works ... all works were overseen by our Confined Space Supervisor who is trained & certificated to City & Guilds Level 4.
Prior to works commencing a number of statutory obligations had to be fulfilled.
A SSOW Safe System of Work was put in place .... this included supplying the Client with site specific Risk & Method Statements.
A PTW Permit to Work was completed by our Supervisor and the Client.
A LOTO Lock Out Tag Out system was put in place on all associated electrical / mechanical plant.
An initial atmospheric reading was taken using a 4 gas air monitor, this PEAK reading was logged on the PTW and the Gas Reading Log.
Once the above obligations were satisfied, our technicians proceeded to carry out the cleaning & inspections.
Cleaning consisted of removal of build up of flour to walls and roof of silos..... the Inspections consisted of providing a written & photographic report on any signs of infestation, condition of explosion blast covers and filtration system.
Cleaning & Inspections to food storage silos must be carried out on an annual basis.
On completion of the works.... the PTW was signed off and the LOTO was restored.
If your Organisation requires any of our Confined Space Services .... please dont hesitate to contact us via our New website