Wednesday, 21 October 2015

Water Ingress Prevention using Rope Access Methods Birmingham

Water Ingress Prevention Birmingham

We have been tasked to carry out a large scale mastic insertion to panel joints to a high rise residential block in Birmingham.

Upon carrying out an inspection of the Block, it was plain to see that previous attempts to counteract the water ingress had failed drastically, this could be put down to a number of factors.....wrong type product had been used.....wrong method being carried out or just plain bad workmanship.



We were given the go ahead and submitted Our Risk Assessment and Method Statement
......we were good to go.

Our Specialised Rope Access Team  had prepared to spend quite a lot of time removing the failed mastic to the joints and also prepared the surface of the joint so the new silicone would have a good key.


Our Technicians .....who have carried out hundreds of water ingress prevention works only spent 4 days carrying out surface preparation and the insertion of the silicone..... approximately 360 linear metres of silicone was inserted.




 If Your Building is suffering with water ingress and could utilise Complete Access

Please do not hesitate to Contact Us 01527 545 687






 

No comments:

Post a Comment