Saturday, 16 November 2013

Rope Access Building Defect Survey & Inspection by Complete Access

Rope Access Building Defect Survey & Inspection  by Complete Access

We have been carrying out a 3 week exercise to deliver Full Defect Surveys & Inspection to x3 High Rise Tower Blocks run by Dudley Metropolitan Council.

The Tower Blocks have had extensive previous repairs which needed to be inspected for integrity.

All previous repairs needed to be documented and hammer tested for soundness.

We also were asked to provide 8 cover, sample, carbonation tests to concrete columns and beams on each block, 8 samples of render were also taken for analysis in the Lab.

All works were undertaken by our Specialist Rope Access Building Investigation Team







If your Organisation requires a Professional Rope Access Company ........Please don't hesitate to Contact Us Tel: 01527 545 687

Saturday, 2 November 2013

Confined Space Silo Cleaning

Confined Space Silo Cleaning

We have been tasked to clean a number of internal double skin silo containing polypropylene.

We were given the task by a Blue Chip Automotive Company that makes the cockpit for the new  BMW MINI which is due out soon,

After RAMS (Risk Assessment & Method Statement) and a SSOW (Safe System Of Work)agreed .....our Specialist Confined Space Entry Team set up the method of entry .....which consisted of  abseiling into the silos with a rescue system consisting a tripod and winch.

A rescue scenario was also performed ...... 1 minute from base to exit using the tripod/winch.



 
Recording Air Monitor readings on a 5 minute basis in accordance with our SSOW.