Rope Access Building Inspections
We are well underway with a new contract to deliver a multitude of services ..... all under the heading of Building Inspections
We have recently completed a full survey to the concrete structure to a building due for refurbishment on Oxford University Brookes Campus.
Carbonation Survey
.
We are well underway with a new contract to deliver a multitude of services ..... all under the heading of Building Inspections
We have recently completed a full survey to the concrete structure to a building due for refurbishment on Oxford University Brookes Campus.
Cover meter Survey
Site determinations of concrete cover to reinforcement
were made using an Elcometer 331 covermeter, in accordance with British
Standard 1881: Part 204: 1988. The particular model of
covermeter employed is designed to locate steel within 100mm of the concrete
surface. Minimum concrete cover to primary and secondary reinforcement was
determined at specific parapet beam locations. Readings were verified by the
removal of sections of concrete to allow for the reinforcement cover to be physically measured.
Carbonation Survey
Depth of carbonation was determined using
phenolphthalein indicator in accordance, with BS EN 14630: 2006. The mean and
maximum depth of the carbonation was measured to an accuracy of 1mm, using a
depth gauge.
If Your Organisation requires any of our Services Please don't hesitate to Contact Us